ApplianceAdda.in

Explore appliances

2 categories · 155 products compared

All categories

Air conditioners buying guide

AC installation checklist for Indian homes

A pre-purchase and installation-day checklist covering electrical load, outdoor-unit placement, copper pipe, drainage, vacuuming and warranty records.

By ApplianceAdda Editorial Team

Quick answer

Installation quality can affect cooling, noise, drainage, energy use and warranty. Agree on the complete scope and price before the technician starts, photograph the model labels, and retain the invoice and installation job sheet.

StageConfirmWhy it matters
Before buyingElectrical load and room sizeAvoids unsafe wiring and wrong capacity
Before drillingIndoor/outdoor positionsControls airflow, noise and service access
Pipe workLength, insulation and vacuumingProtects performance and compressor
DrainageContinuous downward slopeReduces leaks and backflow
HandoverCooling test and documentsCreates a warranty record

Get an itemised quote

Ask what standard installation includes. Common extras include outdoor stand, additional copper, drain pipe, electrical cable, core cutting, dismantling and transport. Confirm rates before work starts.

Do not let a low product price hide a high unplanned installation bill.

Placement and pipe work

The indoor unit needs unobstructed airflow and a drain route. The outdoor unit needs ventilation, secure support and service access. Pipe bends should be controlled, insulation complete and joints made with appropriate tools.

Ask the installer to follow the manufacturer's evacuation or vacuum procedure instead of using refrigerant to purge the line.

Test before sign-off

Run cooling, fan and swing modes. Check unusual vibration, drain flow, remote operation and error codes. Photograph indoor and outdoor model/serial labels and keep the invoice, warranty terms and job sheet together.

Before you buy

  • Confirm sanctioned electrical load and earthing
  • Approve both unit locations before drilling
  • Record extra-material quantities and charges
  • Ask for proper line evacuation
  • Test cooling and drainage
  • Save serial numbers, invoice and job sheet
AC tonnage guide →Compare ACs →

Sources and review standard

Energy-label explanations are checked against the Bureau of Energy Efficiency Standards & Labelling programme. Product-specific claims must be confirmed on the exact model’s manufacturer documentation and current retailer listing. See our methodology.